What review is performed when Elements are issued?


SustinaPlus reviews facility existence, reporting period, generated power amount, receiving-point identifiers, and related consistency based on public facility information and submitted documents. Meter-reading slips, power-sale statements, or similar documents may be required. The current facility registration and generation reporting flow is designed for Japan-based grid-connected renewable energy facilities such as solar, wind, and hydro. Inconsistencies or unclear evidence may lead to rejection.